Request...
1. Qualified Building Permit and Building Occupation Permit
2. Area of the Roof
3. Installation Purpose
4. Location of the Roof
5. Type of Building
6. Service Life of the Building
7. Structure of the Roof
8. Ownership of the Building
9. Ownership of the Land
10. Contact Info
Acquisition of electricity
Acquisition Rate of Solar PV Power, 2018 (high performance)
Source: Bureau of Energy, Ministry of Economic Affairs
Renewable Energy | Type | Capacity range | High Performance (Period 1, max acquisition rate, NTD) |
High Performance (Period 2, max acquisition rate, NTD) |
Solar PV energy | Roof mounted | 1Kw-20Kw | 6.2269 | 6.0943 |
20Kw-100Kw | 5.0780 | 4.6968 | ||
100Kw-500Kw | 4.7238 | 4.6254 | ||
More than 500Kw | 4.5860 | 4.4975 | ||
Ground mounted | More than 1Kw | 4.6412 | 4.5520 | |
Floating | More than 1Kw | 5.0586 | 4.9715 |
- If the renewable energy power generation system is installed in the outlying island area, and the power system is not connected with the Taiwan power net by any submarine cable, the acquisition rate rises up to15%. However, once the system is connected with the Taiwan’s power net, then the acquisition rises only up to 4%.
- Solar PV system located in the northern region (including Keelung City, Taipei City, New Taipei City, Taoyuan City, Hsinchu County, Hsinchu City, Miaoli County, Yilan County and Hualien County), and complied with the acquisition rate for 2018, the acquisition rate increases by 15% more.